Renovation contract template.
Clear scope, stage payments and written changes.
A solid renovation or fit-out contract does not need twenty pages of legal jargon. It needs to tie both signatures to an itemised estimate, link payments to completed stages and set clear rules for extra work and handover. Copy § 1–8 below or download the editable Word (.docx) file.
This is not legal advice. The template shows a practical renovation contract structure. Adapt it to your project and local jurisdiction, or consult a qualified lawyer.Statutory references checked on 7 November 2026.
Free template
Renovation and fit-out
works contract template.
Fill in the bracketed fields with details from your quote, or download the editable Word (.docx) document below.
Renovation and Fit-Out Works Contract No. contract number
concluded on date in city between Contractor: company name, registered address, tax ID (the Contractor) and Client: full name, address, phone, email (the Client)
§ 1. Subject and Scope of Work
- The Client commissions, and the Contractor undertakes to carry out, renovation and finishing works at property address with a floor area of area m².
- The detailed room breakdown, work items, units and prices are set out in Schedule 1 — Estimate / Quote No. quote number dated quote date, which forms an integral part of this Contract.
- The Client confirms their right to authorise the works at the property.
§ 2. Dates and Work Schedule
- Site handover to the Contractor and start of works will take place on start date.
- Completion of the Contract scope is scheduled for completion date.
- The completion date extends correspondingly if works are paused for reasons attributable to the Client (including late delivery of Client-supplied materials) or when additional work is agreed in an annex.
§ 3. Price, Deposit and Stage Payments
- For the scope in Schedule 1, the Parties agree a unit-rate estimate / lump-sum price of net amount and currency net plus VAT at rate% (VAT amount), giving a total gross price of gross amount and currency.
- Payments are made by bank transfer to the Contractor’s account bank account / IBAN within e.g. 5 days of meeting each milestone condition below.
Deposit and milestone payment schedule| Instalment | Milestone / trigger | Share or gross amount | Due date |
|---|
| Deposit / Stage I | e.g. Contract signature and site handover | e.g. 20% — amount | e.g. within 3 days of signing |
| Stage II | e.g. Interim sign-off of concealed plumbing, wiring and waterproofing | e.g. 40% — amount | e.g. within 5 days of protocol |
| Final balance | e.g. Final handover protocol for all completed works | e.g. 40% — amount | e.g. within 5 days of handover |
§ 4. Materials, Utilities and Site Access
- Base building materials (primers, adhesives, skim coats, waterproofing, plasterboard) are supplied by the Contractor within the Contract price / the Contractor recharged against supplier invoices / the Client.
- Finishings and fittings (tiles, flooring, internal doors, sanitaryware, taps, light fittings, coloured paints) are purchased and delivered to site by the Client at least e.g. 5 days before the relevant stage.
- The Client provides free access to water and electricity at the property during the works. Rubble removal and disposal are arranged by the Contractor / the Client in accordance with Schedule 1.
§ 5. Additional and Omitted Work
- Any work outside Schedule 1 (additional work) or removal of agreed items (omitted work) requires a prior written or documented annex setting out the scope, price adjustment and any date change.
- The Contractor will notify the Client promptly if stripping existing finishes reveals concealed defects requiring work not covered by Schedule 1.
§ 6. Interim and Final Handovers
- Concealed works (including first-fix plumbing, wiring and wet-zone waterproofing) must be inspected and recorded before boarding, plastering or tiling covers them.
- The Client will attend handover within e.g. 3 business days of the Contractor’s notice, and both Parties will sign a handover protocol.
- Any minor snagging items identified at handover are listed in the protocol together with an agreed deadline for remedy.
§ 7. Statutory Defect Liability and Workmanship Warranty
- The Contractor is liable for physical defects in the completed works under applicable statutory warranty rules.
- Independently of statutory rights, the Contractor grants a workmanship warranty of e.g. 24 months from final handover / grants no separate contractual warranty beyond statutory liability.
- Warranty does not cover hidden manufacturing defects in Client-supplied materials or fittings that could not be detected with due care before installation, nor damage caused by improper use.
§ 8. Final Provisions
- Amendments to this Contract require written form / documented form confirmed by both Parties unless expressly stated otherwise.
- Matters not regulated herein are governed by the applicable civil law of country / jurisdiction.
- Prepared in two identical copies, one for each Party. Schedule 1 (Estimate / Quote) forms an integral part of this Contract.
ContractorClient
Illustrative template. Pricing model, applicable VAT rate, delay penalties and cancellation rules should be tailored to your project and local law.
Statutory context
Civil-law reference
for renovation contracts.
Reference rules under the Polish Civil Code and EU/Polish consumer rules (for contracts governed by Polish law — check equivalent rules in your jurisdiction).
Written form and attached scope
Under the Polish Civil Code, construction and building renovation contracts should be confirmed in writing (Articles 648 § 1 and 658 KC), and smaller fit-out contracts often apply contract-for-work rules (Article 627 KC). Keeping a signed contract with an itemised estimate protects evidential clarity (Article 74 KC). [1]
Advance payment vs. statutory earnest money
Under Polish law, an ordinary advance payment (zaliczka) is settled against work performed if the contract ends early, whereas earnest money (zadatek, Article 394 KC) carries statutory forfeiture or double-return rules. Name the chosen payment type explicitly in § 3. [1]
Estimate pricing vs. fixed lump sum
With unit-rate estimate pricing, extra work requires client consent (Articles 629–630 KC). With a lump sum, the agreed total stays fixed for the contracted scope (Article 632 KC), so any scope change should be recorded in an annex (Article 77 § 1 KC). [1]
Stage handovers and defect liability periods
Unless agreed otherwise, completed stages can be handed over progressively against partial payment (Article 654 KC). Statutory liability for defects runs for 2 years from handover, or 5 years for immovable property works (Article 568 § 1 in conjunction with Articles 638 and 656 § 1 KC). [1]
Off-premises consumer contracts
When a business signs a contract with a consumer away from business premises (for example during an apartment survey), EU/Polish consumer rules grant a 14-day withdrawal period and require clear notice. [2]
- 01
Room-by-room quote & PDF
Price the flat at your own rates and let your client approve the quote online with an email code, without creating an account.
- 02
Draft contract from the quote
Generate a working contract with payment stages from the accepted quote — ready to print for paper signing or for client sign-in confirmation.
- 03
Annexes for extra work
When extra work comes up on site, build an annex from estimate items and collect client approval by email code.
- 04
Handover protocols & warranty
Record stage handovers, snagging items with deadlines and warranty reviews inside the same project folder.
Sources
Official legal sources.
Consolidated statutory text in the Polish Journal of Laws and official consumer guidance. Check current local rules before signing.
- Polish Civil Code (consolidated text, Journal of Laws 2026 item 795), Articles 74, 77, 394, 556, 568, 627–632, 638, 647–648, 654, 656, 658 — Journal of Laws, api.sejm.gov.pl. Checked on 7 November 2026.
- Right of withdrawal — off-premises consumer contract time limits — UOKiK, prawakonsumenta.uokik.gov.pl. Checked on 7 November 2026.
Questions
Renovation contract template — FAQ
What should always be attached to a renovation contract?
An itemised quote or estimate broken down by room, task, unit and rate (Schedule 1). Without it, neither side has a clear baseline when scope questions come up on site.
How should extra work during the renovation be handled?
Before carrying out extra chasing, sockets or tiling, agree a short written annex stating the added or omitted items, price difference and any date impact. See our renovation contract annex template.
How do stage payments usually work?
Contractors and homeowners typically agree a start deposit followed by stage payments tied to interim sign-offs (such as concealed plumbing and waterproofing) and a final balance on signing the handover protocol.
Can I download this contract as an editable Word file for free?
Yes. Click “Download Word template (.docx)” — no email or registration required — and edit the document in Microsoft Word, LibreOffice or Google Docs.